ANNUAL INTEGRATED REPORT 2017

RELEVANT MATERIAL ISSUE/S

  • Maintaining constructive communication channels with all our stakeholders
  • Maintaining our legislative and regulatory compliance, focusing on the MPRDA and the Mining Charter

RELEVANT IDENTIFIED RISKS

  • Licence to operate

Key stakeholders in our business include the communities within which we operate, as well as shareholders, suppliers, customers and government, among others.

Open, honest and respectful engagement is essential to our earning and preserving our social licence to operate – as well as our legal right to do so. These in turn are essential to the sustainability of our business. We recognise our responsibility to share the value we create at our mining operations, thus contributing to the socio-economic upliftment of our communities. We take cognisance of our need to maintain our legislative and regulatory compliance and we strive to meet or exceed Mining Charter targets.

STAKEHOLDER ENGAGEMENT

We define our stakeholders as those individuals, groups and entities directly affected, both positively and negatively, by our business activities.

External stakeholder engagement is the responsibility of Northam’s chief executive and chief financial officer, while internal stakeholder engagement is undertaken by the general managers at each operating mine, together with the executive officer human resources (HR).

Major impacts in the area of stakeholder relations are felt at operational level. For this reason, operational management is empowered to deal with concerns raised by stakeholders. Management is committed to reacting timeously to stakeholder concerns, and engages both formally and informally. External stakeholder concerns may be escalated to the chief financial and chief executive officers.

The group conducts a sustained programme of communication directed at its stakeholders, including shareholders and their advisors, employees, unions, communities, government and regulators and NGOs.

Northam is a member of the Chamber of Mines and actively participates in the Chamber’s industry initiatives.

Engaging with our stakeholders
Shareholders, providers of capital, research analysts, fund managers, media

Northam provides information on operating, financial and other performance in a timely manner and using clear and plain English.

Channels of communication include:

  • regulatory channels such as the JSE Stock Exchange News Service (SENS)
  • website postings
  • electronic communiques to a database of registered stakeholders including the investment community and media
  • regular briefings to apprise the investment community of company developments and performance
  • formal one-on-one meetings with significant shareholders

Shareholders are encouraged to participate in the AGM of the company and to raise issues of concern or interest directly. The notice of meeting is a regulated issue and shareholders are notified accordingly.

Employees and unions

Relations with employees and organised labour are governed by recognition agreements and conditions of employment by legislation.

Northam supports the rights of all employees to freedom of association and acts in accordance with the South African Constitution, prescribed legislation, industry compacts and recognition agreements with unions.

The company encourages open communication and employees are encouraged to raise issues of concern and interest via the formal and informal structures in place, including through the human resources department, line management and union structures.

Communities

Northam engages on a formal and regular basis with local authorities, including the Moses Kotane and Thabazimbi municipalities ipn respect of Zondereinde, and the Greater Tubatse and Thaba Chweu municipalities in respect of Booysendal. Community forums are in place to address community concerns, such as local employment, training and development, and procurement.

Community development is undertaken according to the commitments made in our SLPs. In line with the requirements of the SLP, Northam ensures that its community development policies and practices are aligned with those of the local municipalities’ integrated development plans (IDPs) as far as is reasonably possible.

Customers

Northam has long-standing relationships with its customer base. The company’s marketing department maintains regular weekly contact with its domestic and international customers, and hosts customer meetings and visits customer facilities. Customer representatives, in turn, visit Northam’s mining and metallurgical operations.

Any issues relating to customer satisfaction are taken up directly with the marketing department.

Stakeholder engagement summary
Key stakeholdersTopics and concernsCommunication channels
Shareholders and investors
  • Operating and financial performance
  • Share price performance and dividends
  • Issues related to the sustainability of the company:
    • risk mitigation
    • legislation
    • safety
    • labour relations
  • Announcements on SENS
  • Website
  • Interim, preliminary and annual results presentations
  • One-on-one investor meetings
  • Investor site visits
  • Roadshows
  • AGMs and special shareholder meetings
  • Annual integrated reports
  • Carbon Disclosure Project (CDP) climate change submissions
  • CDP water submissions
Employees
  • Wage negotiations
  • Job security
  • Training and development
  • Health and safety
  • Company performance
  • Group policies
  • Collective bargaining practices
  • Team briefings
  • Two-way manager-employee
  • communication
  • Let’s Talk campaigns:
    • recruitment
    • HIV/AIDS
    • education
    • performance
Customers
  • Continued availability of supply
  • Quality of supply
  • Impact of any industrial action on supply
  • Announcements on SENS
  • Group reports
  • Website
  • Formal presentations
  • Roadshows
  • Site visits
  • CDP climate change submissions
  • CDP water submissions
Suppliers and contracting companies
  • Sustainability of the company
  • Financial performance
  • Employment practices
  • Local procurement practices
  • Preferential procurement practices
  • Quality control
  • Impact of any industrial action on suppliers
  • Announcements on SENS
  • Company practices and policies
  • Preferential procurement policies
  • Open days
  • Dialogue
Media
  • Operating and financial performance
  • Corporate activity
  • Environmental issues
  • Community-related topics
  • Impact of any industrial action on the group, employees, the industry and the
  • South African economy
  • Announcements on SENS
  • Website
  • Online presentations
  • Media site visits
  • Group reports and results
  • Interviews
Communities and NGOs
  • Local economic development
  • Corporate social investment
  • Job opportunities and employment
  • Skills development
  • Health related issues
  • Environmental impact
  • Impact of any industrial action on local business
  • Community forums
  • Stakeholder forums
  • Industry partnerships
  • Community engagement programmes
  • Wellness campaigns
  • Dialogue
Government and regulatory authorities
  • Labour relations
  • Licence to operate
  • Employment
  • Education and training
  • Environmental impact and rehabilitation
  • BBE empowerment and ownership
  • Compliance with legislation
  • Formal processes
  • Participation in industry associations
  • Social and labour plans
  • Dialogue
  • Group reports
  • Site visits
  • South African Revenue Services
  • Department of Mineral Resources

SOCIAL AND LABOUR PLANS

The MPRDA of 2002 requires the submission and approval of SLPs as a prerequisite for the granting of mining or production rights. SLPs require the development and implementation of comprehensive human resources development programmes, a mine community development plan, housing and living conditions plan, employment equity plan and processes to save jobs and manage downscaling and/or closure.

Northam believes that these programmes are aimed at promoting employment and the advancement of the socio-economic welfare of all South Africans while helping ensure economic growth. In particular, we acknowledge the important role of the current Mining Charter, provision for which was made in section 100(2)(a) of the MPRDA, as an instrument of transformation in the industry with the help of set targets.

By our adherence to the MPRDA and the current Mining Charter, we share the value we create at our mining operations with stakeholders, as we strive to meet or exceed set targets.

MINE COMMUNITY DEVELOPMENT

APPROACH AND STRUCTURE

Northam recognises its responsibility to contribute to local communities and to major labour-sending areas, providing project and infrastructural support in pursuit of sustainable socio-economic upliftment. We maintain open and proactive communication channels with community structures and other stakeholders in order to deal with community concerns, expectations and developments. The group seeks to mitigate any negative impacts of our mining operations on local communities.

In compliance with the requirements of the MPRDA and the Mining Charter, Northam’s operations focus on contributing to mine, community and rural development. The operations, therefore, pay significant attention to the establishment of local economic development (LED) projects identified in SLPs.

Northam’s SLPs are aligned with the integrated development plans (IDPs) of local municipalities to address community needs effectively. In addition to LED, the group also supports several projects that are not necessarily in the ambit of its SLPs but are considered worthy causes. These are referred to as corporate social investment or CSI.

Compliance with aspects of the Mining Charter relating to LED and related issues is the responsibility of the executive officer HR under the guidance of the SE&HR committee. The committee updates the board on a quarterly basis on compliance with the Mining Charter.

Operational CSI committees comprise three members of management and one representative from each of the organised employee representative bodies. They meet on a monthly basis to identify, prioritise and allocate resources to sustainable projects. Key interventions are planned with local municipalities.

A community and rural development strategy is applied in identifying and implementing community projects. The strategy includes stakeholder mapping, an analysis of expectations and immediate risks, as well as protocol for constructive engagement with government and related stakeholders to ensure a co- ordinated approach to community development.

COMMUNITY DEVELOPMENT PERFORMANCE IN F2017

ZONDEREINDE

In F2017, a total of R3.9 million was spent on CSI and LED.

The identification of suitable LED projects and CSI activities in the areas surrounding the mine is guided by the Zondereinde SLP and the operation’s CSI committee. Responsibility for the operation’s SLP falls under the human resources department.

Zondereinde engages with traditional leaders, and with three municipalities:

  • Thabazimbi Local Municipality in Limpopo
  • Moses Kotane Local Municipality in North West Province, a labour-sending municipality
  • OR Tambo District Municipality in the Eastern Cape, also a labour-sending municipality

A mining forum was established in F2016 in order to improve communication and coordination between the mines and municipal representatives on large-scale projects to improve infrastructure and delivery in the area. The lack of service delivery and poor follow-up and support from local municipalities remain a significant challenge, with the group sometimes having to contribute to service delivery instead of focusing on economic growth.

After prolonged engagement, Zondereinde’s updated SLP was aligned with the Thabazimbi Local Municipality’s IDP. SLP projects include:

  • road infrastructure
  • school infrastructure
  • support services at the Spitzkop school for the disabled
Name of projectFocus/objectiveProject detailsOngoing/ once-offSpend (R000)
Community Development CentreIncome generationAn investment in a community skills development centre aimed at improving the education and skills levels of local communities. The focus is on an income generating agricultural project for the Thabazimbi community.Ongoing1 276
Community engagement Establishment of a community trustConsultancy fees for engagement with municipalities, local tribal leadership and for public participation. Also for the training and orientation of trustees.Ongoing671
Mojuteng home ownership schemePromotion of home ownershipRates were subsidised as part of the Mojuteng home ownership scheme.Ongoing188
Bursary schemeEducationBursaries were specifically aimed at encouraging HDSAs and young women to pursue careers in mining-related fields.Ongoing340
Barney’s Nursery SchoolEarly childhood developmentTop-up funds were provided to cover the costs of the facility and educators’ salaries.Ongoing207
Thabang feeding schemePoverty alleviationThe provision of food parcels to needy school children in the community.Ongoing71
School lunch packsPoverty alleviationThe provision of food parcels to needy school children in the community.Ongoing6
International Literacy DayEducationZondereinde hosted this event in conjunction with the MQA and NUM. Some 1 500 AET learners from across the country attended this event.Once-off106
Women in Mining DayWomen’s development, safety and healthA Women in Mining celebration took place at Zondereinde, focusing on women’s success stories and women’s safety and health. Once-off156
DonationsPoverty alleviationDonations to organisations that fight poverty.Once-off912
Total spend in F20173 933

No LED projects were advanced in terms of Zondereinde’s revised SLP during F2017. These will be reported on in F2018.

BOOYSENDAL

In F2017, some R3.0 million was spent on CSI and LED.

Booysendal’s LED and CSI activities are coordinated by the divisional human resources manager, who is also responsible for oversight of community engagement in the area. The operation’s management team under the leadership of the general manager have oversight of both the SLP process and CSI.

Booysendal mine is located in a remote region of the Limpopo province where there are limited economic opportunities. Agriculture, forestry, mining and tourism are the region’s primary activities. A further major challenge is the low level of literacy and education in the area, which is rated among the lowest in South Africa.

The key areas to be developed in the Booysendal area as articulated in the Greater Tubatse and Sekhukhune District Municipalities IDPs are:

  • Water and sanitation
  • Electricity
  • Roads
  • Education, especially mathematics and science
  • Income generation and job-creation projects, with the primary focus on women and people with disabilities

Stakeholder identification and engagement at Booysendal has been ongoing since the mine’s inception, but this is complicated by the scale, proximity and needs of local communities, and by historic interests in landholdings. Booysendal has sound working relationships with its stakeholders and engages with them mainly through the following structures:

  • Sekhukhune District Municipality (SDM)
    • Executive mayor’s office
    • Socio-Economic Development Managers’ Forum
  • Greater Tubatse Local Municipality
    • LED Forum
    • Greater Tubatse Mining Forum
    • Southern Cluster Mining Community Development Committee
  • Thaba Chweu Local Municipality
    • Executive mayor’s office

Several forums have been set up in the area where Booysendal operates. These provide channels for Booysendal to facilitate the flow of meaningful benefits to communities, help the mine to keep abreast of concerns among community members and to address any issues raised. We also have a community complaints register in place.

Forums in the Booysendal area
Booysendal North
ForumStructure and compositionRole
Booysendal Community

Comprises 15 families who have historical connections with the mine surface footprint

Meets monthly with management representatives

Promotes economic growth, employment and advances socio-economic welfare of identified core communities

Expands social development opportunities for HDSAs and women

Facilitates consultation within the spirit of the MPRDA and the Broad-Based Black Economic Empowerment Amendment Act No 53 of 2003

Stakeholder Engagement

For all interested and affected stakeholders, including local municipalities, DMR, provincial government and other community forums

Meets bi-monthly

Focuses on social and economic upliftment of local communities through positive engagement and contributions in support of sustainable projects and programmes.
Traditional Leadership

For communities within a 50km radius of the mine

Meets quarterly

Focuses on:
  • local recruitment
  • supply chain business opportunities and supporting local entrepreneurs
  • training opportunities including bursaries and learnerships
  • infrastructure development
Booysendal South
Stakeholder Engagement Established in F2017 to engage with a broad group of stakeholders
Traditional LeadershipEstablished in F2017 to engage with local traditional leaders to discuss recruitment, procurementand community development

Booysendal’s updated SLP was approved in F2017. SLP projects include:

  • Electrification project in Matsosho village. Some 352 households will benefit from this R6.5 million project.
  • Water and sanitation project. A local school will be upgraded in this R4.0 million project.
  • PPE workshop. Consultation with beneficiaries has been completed and a business model is being developed.
  • Ngwaabe Combined School science laboratory. Consultation with the Department of Education has been completed. Building plans are awaiting approval.
  • Tarring of Potgieter Road in Mashishing. To be implemented in F2020.
  • Tarring of road in Matsosho village. To be implemented in F2020.
Booysendal – corporate social investment spend in F2017
Name of projectFocus/objectiveProject detailsOngoing/ once-offSpend (R000)
South African Police ServiceSafety and crime preventionCrime awareness campaign to proactively prevent crimeOnce-off5
Dinalane Early Childhood Development CentreEducationProject designed to contribute to early childhood development. The centre was completed and handed over to its beneficiariesOnce-off25
Grave relocationDevelopment of Booysendal South mineAssistance with the sensitive relocation of graves to places chosen by the families of the deceasedOnce-off182
Kutullo soccer fieldsSports developmentEncouraging young people to take part in the healthy option of sport rather than spending time on the street where they are vulnerable to substance abuseOnce-off48
Booysendal South traditional leadershipStakeholder relations improvementThis initiative included token gifts as recognition for the important role traditional leaders playOnce-off4
Stakeholder relations engagementCommunity developmentThe provision of transport and refreshments during community engagementsOnce-off94
Total spend in F2017358
Booysendal social and labour plan – local economic development spend in F2017
Name of projectFocus/objectiveProject detailsOngoing/ once-offSpend (R000)
SMME developmentDevelopment of local business/SMMEsProject is designed to assist local SMMEs to access business opportunities emanating from mining activitiesOngoing1 995
R577 Infrastructure development and the reduction of accidentsThe R577 is used by people from the nearby farming communities and mine employeesOngoing613
Total spend in F20172 608

LOCAL COMMUNITY RELATIONSHIPS

Northam enjoys a reasonably healthy relationship with the communities where it operates. However, these relationships play out in areas of very low economic activity, among community members often with low education and skills levels and this inevitably brings challenges to bear on those relationships.

Both operations have developed databases of local skills to assist in recruitment requirements.

ZONDEREINDE

At Zondereinde, councillors and traditional leaders collaborate with the mine in respect of key interventions such as local recruitment, CSI and LED projects. Engagements with communities are on a needs basis and relationships to date can be reported as constructive and fruitful.

Some civil unrest took place in our Welgeval community in F2017, mainly relating to a lack of job opportunities. The mine engaged with the young people who were protesting and collected their CVs for future job opportunities and the cadetship programme.

BOOYSENDAL

As discussed under Human capital, some civil unrest took place around Booysendal in F2017, prompted in the main by the lack of job opportunities in the area. See table below for Northam’s response.

Northam is currently engaged with other companies in the area and initiatives led by local government leaders to deal with service delivery protests.

Northam’s response to community unrest in Booysendal area (F2017)
Community complaintSteps taken to ease problem
Lack of job opportunities/mine recruitmentWe used our engagement platforms to discuss this issue. Community engagement included the explanation of company policies and procedures.
Procurement

We used our engagement platforms to discuss this issue.

Two business consultants were appointed to facilitate enterprise development initiatives among our local communities. Their role also includes promoting a clean and sustainable supply chain.

Infrastructure development

We used our engagement platforms to discuss this issue. Our SLP has been approved with the following projects ready to be implemented in F2018

  • electrification project
  • water and sanitation project
  • PPE workshop
  • Ngwaabe Combined School science laboratory

LOCAL EMPLOYMENT AND PREFERENTIAL PROCUREMENT

As previously indicated, Northam’s mines are in areas of low economic activity where there are limited employment opportunities, resources and infrastructure. Northam is unable to meet all local employment and other requirements and also recognises the need to think beyond the operational lives of its mines. Northam works closely with municipal officials to manage community expectations and has assisted in identifying economic targets which could be developed by way of small, medium and micro enterprises (SMMEs) in collaboration with local entrepreneurs.

ZONDEREINDE

In F2017, 21% of permanent employees came from the Limpopo province, and 19% originated from the North West province.

In order to limit the dependence of communities on the mining industry for jobs, Zondereinde has prioritised key economic areas to be developed through the contributions of small businesses and local entrepreneurs. These areas include:

  • Environment and waste management
  • Agriculture
  • Construction

In pursuit of developing a local supplier base, a supplier forum has been established at Zondereinde, with mining companies and municipal officials represented on the steering committee. Ongoing engagements are held with local community structures and with municipal council representatives during which specific issues relating to sustainable small business development and establishment of local economies are considered.

The incubation and training process of local SMMEs does take time before they are compliant which then enables us to procure their services. Zondereinde has identified all SMMEs and interviews have been conducted to assess any gaps which will be addressed via training and business support interventions.

BOOYSENDAL

As at the end of June 2017 an average of 60% of the total workforce of Booysendal mine came from the local community. Booysendal is committed to hiring people from our host communities at all levels of the workforce and encourages contracting companies to do the same in support of local development.

The mine strives to provide meaningful support to small and medium-sized businesses in nearby communities as well as those who are already providing services to the mine so that they can contribute to the development of the local economic base.

Booysendal supports some 13 local SMMEs who provide a range of services including transport, change house maintenance, landscaping, and printing.

In collaboration with the local municipalities around Booysendal, mine management has contributed towards the establishment of a dynamic database for appointment of local suppliers with the necessary skills and experience, particularly in the fields of engineering, trackless mining and plant operations. This database continues to provide a sound base for the recruitment of local labour.

GROUP PREFERENTIAL PROCUREMENT

In compliance with the Mining Charter, Northam is committed to giving preference to local businesses in the communities surrounding its operations. Northam’s procurement policy accordingly gives local BEE companies preferred supplier status. Northam accords preferred-supplier status to HDSA suppliers subject to commercial competitiveness. Northam spent R4.6 billion in F2017 (F2016: R3.5 billion) on procurement, of which 75.3% or R3.4 billion was allocated to BEE suppliers.

Consolidated report on HDSA expenditure
 CapitalServices and contracting companiesConsumablesTotal 
HDSA spend as % of total discretionary spend43.20%86.14%57.89%65.90% 
 R000R000R000R000% spend
HDSA owned*231 4181 367 774236 0731 835 26540.33
HDSA empowered**364 234360 564438 1381 162 93625.56
HDSA influenced***0.00
HDSA spend595 6521 728 338674 2112 998 20165.89
Exempt micro enterprises0.00
Multinational enterprises370 95422 61032 451426 0159.36
Measured HDSA spend966 6061 750 948706 6623 424 21675.25
Without HDSA412 187252 279413 2901 077 75623.68
HDSA influenced***6283 27844 61048 5161.07
Total discretionary spend1 379 4212 006 5051 164 5624 550 488100.00
Non-discretionary spend     
Electricity   670 820 
Water   28 266 
Municipal services   283 
Total spend   5 249 857 
  • * >50% BEE equity
  • ** >25% BEE equity
  • *** >5% – <25% BEE equity

BEE TRUSTS

The two community beneficiary groups which participate in the Zambezi Platinum consortium are located in the neighbourhoods of the Zondereinde and Booysendal mines.

Northam has made progress in putting in place the Trusts to regulate the disbursements which will be paid to the communities in the future. The community trusts have already benefitted in the amount of R25.9 million each (a percentage of the R400 million lock-in fee paid to the BEE consortium at the time of the transaction), and like all other shareholders, will benefit further financially when Northam resumes dividend payments. Northam has not paid dividends in recent years owing to weak PGM prices and its large capital expansion programme.

The Booysendal Community Trust is operational. All trustee appointments have been registered with the Master of the High Court; have participated in a trustee orientation session and have held two meetings. After consultation with their constituencies, the community trustees have forwarded project proposals to the Trust for consideration.

With regard to the Zondereinde Community Trust, all the identified beneficiary communities have been consulted. Community, independent and Northam Platinum trustees have been identified and their appointments are in the process of being lodged with the Master of the High Court. Trustee training, orientation and the Trust’s first meeting are scheduled to take place before November 2017.

All is on track for the Trusts to disburse educational bursaries, fund community skills development programmes and consider health related projects in 2018.